Journal Article Title: Leaning Bridge Piers
Article Author(s): LEONARD, ROY J., PH.D., P.E.
Volume: 4
Volume #: 2
Month: December
Year: 1987

Abstract:

Relocation of a major county road in the Midwest required the construction of a five-span, 3 19 foot long bridge over a creek. Each pier consisted of a reinforced concrete panel 56 feet high, 22 feet wide and 2 feet thick, with a top cap and a footing. All footings were 10 by 26 by 2 feet in size and were founded on shale at depths varying from 15 to 20 feet beneath the existing alluvium. As specified by the design engineer, after the piers had been completed, the approach fills were installed with normal earth moving equipment. After the abutment piling with caps had been constructed, it was discovered by span measurements that the piers were out of plumb. One was tilted so badly that the design engineer ordered it replaced by the contractor at no cost to the county. He claimed that the procedures and methods of backfilling around the piers were at fault. In response, the contractor said that he had followed the specifications and his whole operation had been witnessed by the designer's inspector. Subsequent investigation by engineers of both the designer as well as the contractor resulted in differing explanations for the failure. However, an arbitration panel, after hearing the evidence, ruled in favor of the contractor and awarded him the full amount of his claim.

Download this paper